![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
CURRICULUAM VITAE
PERSONAL DETAILS
1. Name
2. Date of Birth
3. Nationality
4 Martial Status
ACADEMIC QUALIFICATION
: Chockalingam.N
: 23rd October 1974
: Indian
: Married with one Child
CHOCKALINGAM.N
Bachelor of Engineering (Civil)
Madurai Kamaraj University,
Tamil Nadu State, India
1993 - 1997
Masters in Business Administration (Distance education)
ICFAI University,
RELEVANT EXPERIENCE
Hyderabad , India
2006
I am a qualified Civil Engineer with TEN years of experience with particular
experience in infrastructure projects. I have worked with consultants’ clients and
contractors with experience encompassing, aspects of design, supervision of works,
quality of works, tendering, preparation of Bill of Quantities, planning, preparation of
drawings and technical coordination. My experience includes working in capacities,
such as, Site Engineer, Design Engineer, Technical Coordinator and Senior Project
Engineer.
Structural Design Works Experience
· I have worked with the following codes
Indian standards - I.S 456, SP 16 & SP34
American Standards-ACI 318, ACI 315
German Standards - DIN 1045
· Preparation of detailed Reinforcement drawings based on Finite Element outputs.
· Design of culverts for roads based on survey data and rainfall data
· Review of structural designs made by the main contractor and design coordination
between contractor and consultant.
Consultancy and Contractual Works Experience
· Principles of Measurement (POM – 1)
· Interpreting of Contractual Clauses as per FIDIC.
· Preparation of Tender Documents, inclusive of Prime Document, Specifications
and Bill of Quantities. Involved in preparation of Tender documents for Business
Hotel project in Hyderabad International Airport.
· Preparation of bar bending schedules for roads, culverts and buildings
· Quantity take-off for preparation of Bill of Quantities and Billing. Involved in the
takeoff of quantities for Bangalore International Airport and Taiwan High speed
rail Track
· Planning & scheduling of works using MS projects for Male’ International Airport
· Measurement of work to derive quantities for verification of bills and extra claims.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Supervision work experience
· Material testing, confirming compliance with specifications and recommendations.
· Inspection of excavation, checking of pipe invert levels and bedding.
· Correspondence with Employer and Contractor.
· Monitoring Progress and Quality at Site.
· Technical coordination between Civil Team and MEP team at Hyderabad
International Airport Project
· Preparation of site notices for non-conformities.
· Preparation Monthly progress Reports..
GENERAL WORK EXPERIENCE
Institution
Posted at
Designation
Duration
Description of
Project
: GMR Hyderabad International Airport, India
: Hyderabad, India
: Project Engineer
: January 2006 – Till Date
: The project is a Green field Airport located at Hyderabad,
India. It involved constructing an airport from scratch. The
two main contractors were 1. M/S China state construction
company, Hongkong for the Passenger Terminal Building
and Air Traffic Control Tower and 2. M/S Larsen & Toubro,
India for the Runway, Taxiway, Apron, Approach Road,
Cargo Terminal Building, MRO Building and all other
buildings on the Airside.
The architects were Arup from Hongkong and the
consultants were Cowi Avia Plan.
Nature of work : Inspection and approval of all concrete works for the
passenger Terminal Building (60,000 m2) and the ATC
Tower (75 m in height), which was cast using jump
formwork. The work included checking of rebars,
coordination with MEP team, approval of construction joints
and pouring sequence.
: Inspection and approval of all steel fabrication works for the
roof of the Passenger Terminal Building (3500 tons), Aero
Bridges (800 tons), ATC roof and internal staircase (650
tons). Work included dimensional check, inspection of
material after die penetration & X-ray test. Inspection of
weld, sand blasting and painting and providing proposals to
rectify structural mis-match prior to erection
: Inspection and approval of all finishing works such as false
roofing, bull nose, façade works, tensile fabric roofing,
granite flooring and internal dry wall partitions
: Monitoring of Progress, sticking to deadlines and planning
for the next activity in terms of manpower, machinery and
scope of work.
: Monitoring of Quality of works being executed as per the
Engineers Requirement (ER) and approved method
statements. The above involved interpreting the ER in cases
of disputes, and sending site notices in case of any non-
conformities
: Measurement of works and take of off quantities for
verification of bills and extra claims